PRJ-017 · Carpentry · Cliffside
Cliffside Trim Restoration
New baseboard and casing throughout a main floor after a flooring replacement.
6 items closed

The challenge
New engineered flooring installed with all trim removed — 240 linear feet of baseboard needed, in a 1950s bungalow where no wall runs straight.
The solution
5¼-inch primed baseboard scribed to the new floor, mitres hand-fit, casing reveals set consistent at 6mm, all filled, caulked, and painted as one continuous line of work.
The outcome
Mitres that close without filler. A main floor that finally looks finished.
Materials & finishes
- Primed finger-jointed pine
- 5¼" colonial profile
- Scuff-X semi-gloss
“My father walked the trim with a flashlight. He approved.”
More closed lists

Final item
Your home deserves better craftsmanship.
Send us your list — or let us walk the home and write it with you. Transparent per-item quotes, usually within 24 hours.